Tutorial 2 - Fleming’s Hyperbolic Analysis

Step 5 – sleeve the pile

 

In Step 5, you will sleeve the pile through the made ground.

  1. Open the Algorithms group in the Stockyard and create a Shrinkage-algorithm.

  2. In the Property Inspector, change the Name of the new algorithm to “Length in made ground” and its Shrinkage depth to 1.4m. The Algorithm Option will automatically change to “Custom shrinkage”. This tells the calculation to ignore the top 1.4m of the pile shaft when calculating skin friction.

Screenshot

 

A copy of this step can be found at [Projects]\Tutorial 2\Step 5.rpx.

 

What next?

Step 6 - create the scenario and calculation